Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Gregory Baesler | Bonneville Power Administration | Yes | COR | gdbaesler@bpa.gov | (503) 230-7637 |
Paul Krueger | Bonneville Power Administration | Yes | F&W Approver | pqkrueger@bpa.gov | (503) 230-5723 |
Christine Read | Bonneville Power Administration | Yes | Contracting Officer | clread@bpa.gov | (503) 230-5321 |
A | 15365 | 119 | Manage and Administer Projects | Manage and Administer Value Engineering Review | Manage Contract. The Contractor shall furnish sufficient technical, supervisory, and administrative personnel to insure the expeditious accomplishment of the work specified in this Scope of Work | $0 | 06/12/2006 | 08/13/2006 | |
B | 15366 | 122 | Provide Technical Review and Recommendation | VE Evaluation of Proposed Improvements at Eagle Fish Hatchery | The Contractor shall provide a Certified Value Specialist (CVS) to perform a Value Engineering (VE) Study on the Eagle State Fish Hatchery Improvement Project to evaluate the current design and provide possible value engineering recommendations. Engineering services include the VE examination of the drawings, specifications, and cost estimate. The report will consist of the results of the VE study. | $0 | 08/13/2006 | ||
C | 15367 | 175 | Produce Design | Provide Alternative Design and Specification | The VE team shall use the industry standard VE methodology. This effort shall include study of drawings, specifications, and cost data. The VE study shall develop alternate designs to achieve the required mission(s) or function(s) at the lowest overall cost consistent with performance for structures, structure or facility siting, site development, equipment, electrical systems, and materials or methods. The study may include examination of the life cycle cost, anticipated construction time, and conservation of energy. Design details and analysis will be considered and alternatives developed, as appropriate. The VE team should consider the latest technology in development of alternatives to achieve maximum results for life cycle cost, energy conservation, functional use, and first cost (construction) savings. The study shall not include any previously agreed to program elements such as rearing protocol, location of facilities, bio-program, or basin rearing objectives. Only the engineering design to accomplish the stated goals will be a part of this VE effort | $0 | 08/13/2006 | ||
D | 15368 | 132 | Produce Progress (Annual) Report | Produce Report | Produce a complete VE report | $0 | 08/13/2006 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Manage and Administer VE Review | A: 119. Manage and Administer Value Engineering Review | 08/13/2006 | ||
Provide Value Engineering Report | B: 122. VE Evaluation of Proposed Improvements at Eagle Fish Hatchery | 08/13/2006 | ||
Provide Alternative Design and Specifications | C: 175. Provide Alternative Design and Specification | 08/13/2006 | ||
Completed VE Report | D: 132. Produce Report | 08/13/2006 |
Primary Focal Species | Work Statement Elements |
---|---|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Manage and Administer Value Engineering Review | |||||||
B | 122 | VE Evaluation of Proposed Improvements at Eagle Fish Hatchery | |||||||
C | 175 | Provide Alternative Design and Specification | |||||||
D | 132 | Produce Report |